TABLE OF TABLES

Table 1.1          Compliance Cross-Reference
Table 1.2 Base-case Macro-economic Projections (2006 – 2025)
Table 1.3 Base-case Macro-economic Projections (2026 – 2045)
Table 2.1 Historical Milestones
Table 2.2 Salient Historical Operating Statistics
Table 2.3 Sishen Mine: Historical Production
Table 2.4 Sishen Mine: Current Infrastructure
Table 2.5 Sishen Mine: Historical Operating Statistics
Table 2.6 Thabazimbi Mine: Historical Production
Table 2.7 Thabazimbi Mine: Current Infrastructure
Table 2.8 Thabazimbi Mine: Historical Operating Statistics
Table 2.9 Iron Ore Exploration Properties: Development Stages
Table 2.10 Exploration, Iron Ore: Assen Project
Table 2.11 Exploration, Iron Ore: Kromdraai Project
Table 2.12 Exploration, Iron Ore: Sishen South Phase II Project
Table 2.13 Exploration, Iron Ore: Zandrivierpoort Project
Table 2.14 Exploration, Iron Ore: Falémé Project
Table 2.15 Exploration, Iron Ore: Phoenix Project
Table 2.16 Exploration, Iron Ore: Boven Zeekoebaart Project
Table 2.17 Grootegeluk Mine: Historical Production
Table 2.18 Grootegeluk Mine: Current Infrastructure
Table 2.19 Grootegeluk Mine: Historical Operating Statistics
Table 2.20 Leeuwpan Mine: Historical Production
Table 2.21 Leeuwpan Mine: Current Infrastructure
Table 2.22 Leeuwpan Mine: Historical Operating Statistics
Table 2.23 Tshikondeni Mine: Historical Production
Table 2.24 Tshikondeni Mine: Current Infrastructure
Table 2.25 Tshikondeni Mine: Historical Operating Statistics
Table 2.26 Arnot Colliery: Historical Production
Table 2.27 Arnot Colliery: Current Infrastructure
Table 2.28 Arnot Colliery: Historical Operating Statistics
Table 2.29 Matla Colliery: Historical Production
Table 2.30 Matla Colliery: Current Infrastructure
Table 2.31 Matla Colliery: Historical Operating Statistics
Table 2.32 New Clydesdale Colliery: Historical production
Table 2.33 New Clydesdale Colliery: Current Infrastructure
Table 2.34 New Clydesdale Colliery: Historical Operating Statistics
Table 2.35 North Block Complex: Historical Production
Table 2.36 North Block Complex: Current Infrastructure
Table 2.37 North Block Complex: Historical Operating Statistics
Table 2.38 Coal Exploration Properties: Development Stages
Table 2.39 Exploration, Coal: Grootegeluk West
Table 2.40 Exploration, Coal: Van Wykspan/Zonderwater
Table 2.41 Exploration, Coal: Vredehof
Table 2.42 Exploration, Coal: Strehla
Table 2.43 Exploration, Coal: Morambah South
Table 2.44 Exploration, Coal: Waterberg North and South
Table 2.45 Exploration, Coal: Sheepmoor North
Table 2.46 Exploration, Coal: Carolina
Table 2.47 Hillendale Mine: Historical Production
Table 2.48 Hillendale Mine: Current Infrastructure
Table 2.49 Hillendale Mine: Historical Operating Statistics
Table 2.50 Tiwest JV: Historical Operating Statistics
Table 2.51 Heavy Minerals Exploration Properties: Development Stages
Table 2.52 Exploration, Heavy Minerals: Manombe – Morombe Exploration Project
Table 2.53 Exploration, Heavy Minerals: Letsitele Project
Table 2.54 Exploration, Heavy Minerals: Gravelotte Project
Table 2.55 Exploration, Heavy Minerals: Port Durnford Project
Table 2.56 Exploration, Heavy Minerals: Fairbreeze Project Blocks A, B and D
Table 2.57 Exploration, Heavy Minerals: Kentani Project
Table 2.58 Rosh Pinah: Historical Production
Table 2.59 Rosh Pinah: Current Infrastructure
Table 2.60 Rosh Pinah: Historical Operating Statistics
Table 2.61 Zincor: Historical Operating Statistics
Table 2.62 Chifeng Phase II: Historical Operating Statistics
Table 2.63 Base Metals Exploration Properties: Development Stages
Table 2.64 Exploration, Base Metals: Zebrafontein Project
Table 2.65 Exploration, Base Metals: Rosh Pinah Project
Table 2.66 Exploration, Base Metals: Sperrgebiet Project
Table 2.67 Glen Douglas: Historical Production
Table 2.68 Glen Douglas: Current Infrastructure
Table 2.69 Glen Douglas: Historical Operating Statistics
Table 2.70 Kumba FerroAlloys: Historical Operating Statistics
Table 3.1 Sishen Mine: Typical In-situ Grades
Table 4.1 Sishen Mine: Mineral Resource and Reserve Statement (1 January 2006)
Table 4.2 Sishen South Project: Mineral Resource and Reserve Statement (1 January 2006)
Table 4.3 Thabazimbi Mine: Mineral Resource and Reserve Statement (1 January 2006)
Table 4.4 Iron Ore Mineral Resource Estimate (1 January 2006)
Table 4.5 Arnot Colliery: Physical and Quality Cut-off Parameters
Table 4.6 Matla Colliery: Physical and Quality Cut-off Parameters
Table 4.7 North Block Complex: Physical and Quality Cut-off Parameters
Table 4.8 Grootegeluk Mine: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.9 Leeuwpan Mine: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.9A Leeuwpan Mine: Effect of Land Tenure Application
Table 4.10 Tshikondeni Mine: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.11 Arnot Colliery: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.12 Matla Colliery: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.13 New Clydesdale Colliery: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.14 North Block Complex: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.15 Inyanda Project: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.16 Mafube JV Phase II Project: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.17 Belfast Project: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.18 Ingcamgbu Project: SRK – Audited Coal Resources and Coal Reserves (at 1 January 2006)
Table 4.19 Strehla Project – Coal Resources (at 1 January 2006)
Table 4.20 Moranbah South Project – Coal Resources (at 1 January 2006)
Table 4.21 Ticor SA: SRK – Audited Resources and Reserves (at 1 January 2006)
Table 4.22 Ticor: SRK – Audited Resources and Reserves (at 1 January 2006)
Table 4.23 Heavy Minerals: Mineral Resource Estimate (at 1 January 2006)
Table 4.24 Rosh Pinah: SRK – Audited Resources and Reserves (at 1 January 2006)
Table 4.25 Glen Douglas: Yield Factors and Densities
Table 4.26 Glen Douglas Mine: Mineral Resource and Reserves Statement (at 1 January 2006)
Table 5.1 Sishen Mine: Modifying Factors
Table 5.2 Sishen South Project: Modifying Factors
Table 5.3 Mining Methods of Coal Projects
Table 6.1 Sishen Mine: Main Plant Operating Statistics
Table 6.2 Sishen Mine: Main Plant Product Qualities
Table 6.3 SEP: Plant Product Qualities
Table 6.4 Sishen South Project: Plant Product Qualities
Table 6.5 Thabazimbi Mine: Plant Operating Statistics
Table 6.6 Thabazimbi Mine: Plant Product Qualities
Table 6.7 Tshikondeni Mine: Plant Product Specification
Table 6.8 Thshikondeni Mine: Plant Products
Table 7.1 Sishen Mine: Tailings Dam Capacities
Table 7.2 Thabazimbi Mine: Tailings Dams, Current Operating Specifications
Table 7.3 Thabazimbi Mine: Tailings Dams Capacities
Table 8.1 Estimated Real Capital Expenditures – Scenario I
Table 8.2 Estimated Real Capital Expenditures – Scenario II
Table 9.1 Historical and Current Workforce Deployment for the Material Properties
Table 9.2 Exxaro: Historical LoM Productivity Statistic
Table 9.3 Material Properties Terminal Benefits Liabilities
Table 10.1 Historical Safety Statistics – Fatalities
Table 10.2 Historical Safety Statistics – Fatality Rate
Table 10.3 Historical Safety Statistics – LTIFR
Table 11.1 Environmental Liabilities as at 31 December 2005 in ZARm
Table 12.1 Royalty Assumptions
Table 12.2 Sishen Mine: Projected TEPs – Scenario I
Table 12.3 Sishen Mine: Projected TEPs – Scenario II
Table 12.4 Sishen South Project: Projected TEPs
Table 12.5 Thabazimbi Mine: Projected TEPs
Table 12.6 Grootegeluk Mine: Projected TEPs – Scenario I
Table 12.7 Grootegeluk Mine: Projected TEPs – Scenario II
Table 12.8 Leeuwpan Mine: Projected TEPs
Table 12.9 Tshikondeni Mine: Projected TEPs
Table 12.10 Arnot Colliery: Projected TEPs
Table 12.11 Matla Colliery: Projected TEPs
Table 12.12 New Clydesdale Colliery: Projected TEPs
Table 12.13 North Block Complex: Projected TEPs
Table 12.14 Sintel Char Project: Projected TEPs
Table 12.15 Inyanda Project: Projected TEPs
Table 12.16 Mafube JV Phase II Project: Projected TEPs – Scenario I
Table 12.17 Mafube JV Phase II Project: Projected TEPs – Scenario II
Table 12.18 Belfast Project: Projected TEPs – Scenario II
Table 12.19 Ingcambu Project: Projected TEPs
Table 12.20 Hillendale Mine and Fairbreeze Project: Projected TEPs
Table 12.21 Ticor Smelter: Projected TEPs
Table 12.22 Tiwest JV: Projected TEPs
Table 12.23 Rosh Pinah: Projected TEPs
Table 12.24 Zincor: Projected TEPs
Table 12.25 Chifeng: Projected TEPs
Table 12.26 Glen Douglas: Projected TEPs
Table 12.27 Kumba FerroAlloys: Projected TEPs
Table 13.1 Base-case Spot Contract Price Projections for Iron Ore (2006 – 2025)
Table 13.2 Base-case Commodity Projections for Coal (2006 – 2025)
Table 13.3 Base-case Commodity Projections for Heavy Minerals (2006 – 2025)
Table 13.4 Base-case Commodity Projections for Base Metals (2006 – 2025)
Table 14.1  WACC Calculations for Material Properties Located in South Africa and Australia
Table 14.2  Taxation Input Parameters as at 1 January2006
Table 14.3  Working Capital Input Parameters as at 1 January 2006: Opening Balances
Table 14.4  Working Capital Input Parameters as at 1 January 2006: Days
Table 14.5 Sishen Mine: FM in ZAR Nominal Terms (2006 to 2018) – Scenario I
Table 14.6 Sishen Mine: FM in ZAR Nominal Terms (2019 to 2025) – Scenario I
Table 14.7 Sishen Mine: FM in ZAR Nominal Terms (2006 to 2018) – Scenario II
Table 14.8 Sishen Mine: FM in ZAR Nominal Terms (2019 to 2029) – Scenario II
Table 14.9 Sishen South Project: FM in ZAR Nominal Terms (2006 to 2018)
Table 14.10 Sishen South Project: FM in ZAR Nominal Terms (2019 to 2029)
Table 14.11 Thabazimbi Mine: FM in ZAR Nominal Terms (2006 to 2010)
Table 14.12 Grootegeluk Mine: FM in ZAR Nominal Terms (2006 to 2025) – Scenario I (Excluding Inferred Resources)
Table 14.13 Grootegeluk Mine: FM in ZAR Nominal Terms (2006 to 2025) – Scenario II (Including Inferred Resources)
Table 14.14 Grootegeluk Mine: FM in ZAR nominal terms (2026 to 2045) – Scenario II (Including Inferred Resources)
Table 14.15 Leeuwpan Mine: FM in ZAR Nominal Terms (2006 to 2020)
Table 14.16 Leeuwpan Mine: FM in ZAR Nominal Terms (2021 to 2035)
Table 14.17 Tshikondeni Mine: FM in ZAR Nominal Terms (2006 to 2014)
Table 14.18 Arnot Colliery: FM in ZAR Nominal Terms(1) (2006 to 2018)
Table 14.19 Matla Colliery: FM in ZAR Nominal Terms(1) (2006 to 2020)
Table 14.20 Matla Colliery: FM in ZAR Nominal Terms(1) (2021 to 2024)
Table 14.21 New Clydesdale Colliery: FM in ZAR Nominal Terms (2006 to 2012)
Table 14.22  North Block Complex: FM in ZAR Nominal Terms (2006 to 2012)
Table 14.23 Sintel Char Project: FM in ZAR Nominal Terms (2006 to 2025)
Table 14.24 Inyanda Project: FM in ZAR Nominal Terms (2006 to 2018)
Table 14.25 Mafube JV Phase II Project: FM in ZAR Nominal Terms (2006 to 2021) – Scenario I (Excluding Nooitgedacht Inferred Resources)
Table 14.26 Mafube JV Phase II Project: FM in ZAR Nominal Terms (2006 to 2027) – Scenario II (Including Nooitgedacht Inferred Resources)
Table 14.27 Belfast Project: FM in ZAR Nominal Terms (2006 to 2020)
Table 14.28 Belfast Project: FM in ZAR Nominal Terms (2021 to 2035)
Table 14.29 Ingcambu Project: FM in ZAR Nominal Terms (2006)
Table 14.30 Hillendale Mine and Fairbreeze Project: FM in ZAR Nominal Terms (2006 to 2017)
Table 14.31 Ticor Smelter: FM in ZAR Nominal Terms (2006 to 2020)
Table 14.32 Ticor Smelter: FM in ZAR Nominal Terms (2021 to 2035)
Table 14.33 Tiwest JV: FM in AUD Nominal Terms (2006 to 2026)
Table 14.34 Rosh Pinah: FM in ZAR Nominal Terms (2006 to 2010)
Table 14.35 Zincor: FM in ZAR Nominal Terms (2006 to 2019)
Table 14.36 Zincor: FM in ZAR Nominal Terms (2020 to 2033)
Table 14.37 Chifeng: FM in RMB Nominal Terms (2006 to 2020)
Table 14.38 Chifeng: FM in RMB Nominal Terms (2021 to 2033)
Table 14.39 Glen Douglas: FM in ZAR Nominal Terms (2006 to 2020)
Table 14.40 Glen Douglas: FM in ZAR Nominal Terms (2021 to 2035)
Table 14.41 Kumba FerroAlloys: FM in ZAR Nominal Terms (2006 to 2020)
Table 14.42 Kumba FerroAlloys: FM in ZAR Nominal Terms (2021 to 2035)
Table 14.43 Sishen Mine: NPV at Various Discount Factors – Scenario I
Table 14.44 Sishen Mine: NPV Sensitivity to WACC – Scenario I
Table 14.45 Sishen Mine: Single Parameter NPV Sensitivity at the WACC – Scenario I
Table 14.46 Sishen Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) –Scenario I
Table 14.47 Sishen Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure) – Scenario I
Table 14.48 Sishen Mine: NPV at Various Discount Factors – Scenario II
Table 14.49 Sishen Mine: NPV Sensitivity to WACC – Scenario II
Table 14.50 Sishen Mine: Single Parameter NPV Sensitivity at the WACC – Scenario II
Table 14.51  Sishen Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) – Scenario II
Table 14.52 Sishen Mine: Twin Parameter NPV Sensitivity at the WACC (Re enue, Capital Expenditure) – Scenario II
Table 14.53 Sishen South Project: NPV at Various Discount Factors
Table 14.54 Sishen South Project: NPV Sensitivity to WACC
Table 14.55 Sishen South Project: Single Parameter NPV Sensitivity at the WACC
Table 14.56  Sishen South Project: Twin Parameter NPV Sensitivity at the WACC (Reenue, Working Costs)
Table 14.57  Sishen South Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.58 Sishen South Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs)
Table 14.59 Sishen South Project: Twin Parameter IRR sensitivity (Revenue, Capital Expenditure)
Table 14.60 Thabazimbi Mine: NPV at Various Discount Factors
Table 14.61 Thabazimbi Mine: NPV Sensitivity to WACC
Table 14.62 Thabazimbi Mine: Single Parameter NPV Sensitivity at the WACC
Table 14.63 Thabazimbi Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.64 Thabazimbi Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.65 Grootegeluk Mine: NPV at Various Discount Factors – Scenario I
Table 14.66 Grootegeluk Mine: NPV Sensitivity to WACC – Scenario I
Table 14.67 Grootegeluk Mine: Single Parameter NPV Sensitivity at the WACC – Scenario I
Table 14.68 Grootegeluk Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) – Scenario I
Table 14.69 Grootegeluk Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure) – Scenario I
Table 14.70 Grootegeluk Mine: NPV at Various Discount Factors – Scenario II
Table 14.71 Grootegeluk Mine: NPV Sensitivity to WACC – Scenario II
Table 14.72 Grootegeluk Mine: Single Parameter NPV Sensitivity at the WACC – Scenario II
Table 14.73 Grootegeluk Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) – Scenario II
Table 14.74 Grootegeluk Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure) – Scenario II
Table 14.75 Leeuwpan Mine: NPV at Various Discount Factors
Table 14.76 Leeuwpan Mine: NPV Sensitivity to WACC
Table 14.77 Leeuwpan Mine: Single Parameter NPV Sensitivity at the WACC
Table 14.78 Leeuwpan Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.79 Leeuwpan Mine: Twin parameter NPV sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.80 Tshikondeni Mine: NPV at Various Discount Factors
Table 14.81 Tshikondeni Mine: NPV Sensitivity to WACC
Table 14.82 Tshikondeni Mine: Single Parameter NPV Sensitivity at the WACC
Table 14.83 Tshikondeni Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.84 Tshikondeni Mine: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.85 Arnot Colliery: NPV at Various Discount Factors
Table 14.86 Arnot Colliery: NPV Sensitivity to WACC
Table 14.87 Arnot Colliery: Single Parameter NPV Sensitivity at the WACC
Table 14.88 Arnot Colliery: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.89 Matla Colliery: NPV at Various Discount Factors
Table 14.90 Matla Colliery: NPV Sensitivity to WACC
Table 14.91 Matla Colliery: Single Parameter NPV Sensitivity at the WACC
Table 14.92 Matla Colliery: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.93 New Clydesdale Colliery: NPV at Various Discount Factors
Table 14.94 New Clydesdale Colliery: NPV Sensitivity to WACC
Table 14.95 New Clydesdale Colliery: Single Parameter NPV Sensitivity at the WACC
Table 14.96 New Clydesdale Colliery: Twin Parameter NPV Sensitivity at the WACC (Revenue,Working Costs)
Table 14.97  New Clydesdale Colliery: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.98 North Block Complex: NPV at Various Discount Factors
Table 14.99 North Block Complex: NPV Sensitivity to WACC
Table 14.100 North Block Complex: Single Parameter NPV Sensitivity at the WACC
Table 14.101 North Block Complex: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.102 North Block Complex: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.103 Sintel Char Project: NPV at Various Discount Factors
Table 14.104 Sintel Char Project: NPV Sensitivity to WACC
Table 14.105 Sintel Char Project: Single Parameter NPV Sensitivity at the WACC
Table 14.106 Sintel Char Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.107 Sintel Char Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.108 Sintel Char Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs)
Table 14.109 Sintel Char Project: Twin Parameter IRR Sensitivity (Revenue, Capital Expenditure)
Table 14.110 Inyanda Project: NPV at Various Discount Factors
Table 14.111 Inyanda Project: NPV Sensitivity to WACC
Table 14.112 Inyanda Project: Single Parameter NPV Sensitivity at the WACC
Table 14.113 Inyanda Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.114 Inyanda Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.115 Inyanda Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs)
Table 14.116 Inyanda Project: Twin Parameter IRR Sensitivity (Revenue, Capital Expenditure)
Table 14.117 Mafube JV Phase II Project: NPV at Various Discount Factors – Scenario I
Table 14.118 Mafube JV Phase II Project: NPV Sensitivity to WACC – Scenario I
Table 14.119  Mafube JV Phase II Project: Single Parameter NPV Sensitivity at the WACC – Scenario I
Table 14.120 Mafube JV Phase II Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) – Scenario I
Table 14.121  Mafube JV Phase II Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure) – Scenario I
Table 14.122   Mafube JV Phase II Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs) – Scenario I
Table 14.123  Mafube JV Phase II Project: Twin Parameter IRR Sensitivity (Revenue, Capital Expenditure) – Scenario I
Table 14.124 Mafube JV Phase II Project: NPV at Various Discount Factors – Scenario II
Table 14.125 Mafube JV Phase II Project: NPV Sensitivity to WACC – Scenario II
Table 14.126 Mafube JV Phase II Project: Single Parameter NPV Sensitivity to WACC – Scenario II
Table 14.127  Mafube JV Phase II Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs) – Scenario II
Table 14.128  Mafube JV Phase II Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure) – Scenario II
Table 14.129  Mafube JV Phase II Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs) –Scenario II
Table 14.130  Mafube JV Phase II Project: Twin Parameter IRR Sensitivity (Revenue, Capital Expenditure) – Scenario II
Table 14.131 Belfast Project: NPV at Various Discount Factors
Table 14.132 Belfast Project: NPV Sensitivity to WACC
Table 14.133 Belfast Project: Single Parameter NPV Sensitivity at the WACC
Table 14.134 Belfast Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.135 Belfast Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.136 Belfast Project: Twin Parameter IRR Sensitivity (Revenue, Working Costs)
Table 14.137 Belfast Project: Twin Parameter IRR Sensitivity (Revenue, Capital Expenditure)
Table 14.138 Ingcambu Project: NPV at Various Discount Factors
Table 14.139 Ingcambu Project: NPV Sensitivity to WACC
Table 14.140 Ingcambu Project: Single Parameter NPV Sensitivity at the WACC
Table 14.141 Ingcambu Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.142 Hillendale Mine and Fairbreeze Project: NPV at Various Discount Factors
Table 14.143 Hillendale Mine, Fairbreeze Project and Block P: NPV Sensitivity to WACC – Scenario I
Table 14.144  Hillendale Mine and Fairbreeze Project: Single Parameter NPV Sensitivity at the WACC
Table 14.145  Hillendale Mine, Fairbreeze Project: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.146  Hillendale Mine, Fairbreeze Project and Block P: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.147 Ticor Smelter: NPV at Various Discount Factors
Table 14.148 Ticor Smelter: NPV Sensitivity to WACC
Table 14.149 Ticor Smelter: Single Parameter NPV Sensitivity at the WACC
Table 14.150 Ticor Smelter: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.151 Ticor Smelter: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.152 Tiwest JV: NPV at Various Discount Factors
Table 14.153 Tiwest JV: NPV Sensitivity to WACC
Table 14.154 Tiwest JV: Single Parameter NPV Sensitivity at the WACC
Table 14.155  Tiwest JV: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.156  Tiwest JV: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.157 Rosh Pinah: NPV at Various Discount Factors
Table 14.158 Rosh Pinah: NPV Sensitivity to WACC
Table 14.159  Rosh Pinah: Single Parameter NPV Sensitivity at the WACC
Table 14.160  Rosh Pinah: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.161  Rosh Pinah: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.162 Zincor: NPV at Various Discount Factors
Table 14.163 Zincor: NPV Sensitivity to WACC
Table 14.164 Zincor: Single Parameter NPV Sensitivity at the WACC
Table 14.165  Zincor: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.166  Zincor: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.167 Chifeng Phase II and Phase III: NPV at Various Discount Factors
Table 14.168 Chifeng Phase II and Phase III: NPV Sensitivity to WACC
Table 14.169  Chifeng Phase II and Phase III: Single Parameter NPV Sensitivity at the WACC
Table 14.170  Chifeng Phase II and Phase III: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.171  Chifeng Phase II and Phase III: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.172 Glen Douglas: NPV at Various Discount Factors
Table 14.173 Glen Douglas: NPV Sensitivity to WACC
Table 14.174  Glen Douglas: Single Parameter NPV Sensitivity at the WACC
Table 14.175  Glen Douglas: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.176  Glen Douglas: Twin Parameter NPV Sensitivity at the WACC (Revenue, Capital Expenditure)
Table 14.177 Kumba FerroAlloys: NPV at Various Discount Factors
Table 14.178 Kumba FerroAlloys: NPV Sensitivity to WACC
Table 14.179  Kumba FerroAlloys: Single Parameter NPV Sensitivity at the WACC
Table 14.180  Kumba FerroAlloys: Twin Parameter NPV Sensitivity at the WACC (Revenue, Working Costs)
Table 14.181  Kumba FerroAlloys: Twin Parameter NPV Sensitivity at the WACC (Revenue,Capital Expenditure)
Table 14.182  Kumba – Summary Valuation: Mineral Rights, Exploration Properties and Non-LoM Mineral Resources
Table 14.183 Eyesizwe – Summary Valuation: Mineral Rights, Exploration Properties and Non-LoM
Table 14.184 Exxaro – Summary Valuation: Mineral Rights, Exploration Properties and Non-LoM
Table 14.185  Summary of Valuation Adjustments – Kumba
Table 14.186 Summary of Valuation Adjustments – Eyesizwe
Table 14.187  Summary of Valuation Adjustments – Exxaro
Table 15.1 Kumba Equity Value Analysis – Scenario I
Table 15.2 Kumba Equity Value Analysis – Scenario II
Table 15.3 Eyesizwe Equity Value Analysis – Scenario I
Table 15.4 Eyesizwe Equity Value Analysis – Scenario II
Table 15.5 Exxaro Equity Value Analysis – Scenario I
Table 15.6 Exxaro Equity Value Analysis – Scenario II
Table 15.7 Kumba Iron Ore Equity Value Analysis – Scenario I
Table 15.8 Kumba Iron Ore Equity Value Analysis – Scenario II
Table 15.9 Kumba Equity Value Analysis: WACC Sensitivity Analysis – Scenario I
Table 15.10 Kumba Equity Value Analysis: WACC Sensitivity Analysis – Scenario II
Table 15.11 Eyesizwe Equity Value Analysis: WACC Sensitivity Analysis – Scenario I
Table 15.12 Exxaro Equity Value Analysis: WACC Sensitivity Analysis – Scenario II
Table 15.13 Exxaro Equity Value Analysis: WACC Sensitivity Analysis – Scenario I
Table 15.14 Exxaro Equity Value Analysis: WACC Sensitivity Analysis – Scenario II
Table 15.15 Kumba: Single Parameter Equity Value Sensitivity at the WACC – Scenario I
Table 15.16 Kumba: Single Parameter Equity Value Sensitivity at the WACC – Scenario II
Table 15.17 Eyesizwe: Single Parameter Equity Value Sensitivity at the WACC – Scenario I
Table 15.18 Exxaro: Single Parameter Equity Value Sensitivity at the WACC – Scenario II
Table 15.19 Exxaro: Single Parameter Equity Value Sensitivity at the WACC – Scenario I
Table 15.20 Exxaro: Single Parameter Equity Value Sensitivity at the WACC – Scenario II
Table 16.1 Summary Equity Value and Share Price: Equity Value Ratios for Kumba
Table 16.2 Summary Equity Value: Equity Value for Eyesizwe
Table 16.3 Summary Equity Value: Equity Value for Exxaro



  back to top