From initiatives dedicated to incorporating diverse stakeholder perspectives and strengthening our existing human resources, to upgrading existing sites to be more modern and efficient, Exxaro’s Mega Projects are geared toward ensuring a more productive tomorrow. These investments have several objectives: to grow the coal business, to expand and increase production volumes in a more sustainable way, and to lead the way towards greater sustainability and community development.

Belfast Implementation

Project Overview:

Belfast Implementation

The Grootegeluk mining complex currently possesses two rail load-out stations, namely the Semisoft Coking Coal Load-out Station (SSCC LOS) and the D8 Load-out Station (D8 LOS). With inadequate surge bin capacity on the D8 LOS (first put into production in the 1990s), and with limitations on the loading capabilities of the SSCC LOS, the implementation of a new rapid load-out station to optimise logistical processes is imperative.

These more efficient operations will ensure compliance with the current and future requirements of Transnet, as well as ensuring Exxaro’s continued competitive advantage. It will increase the volume of transported products on rail and have faster, more accurate train loads. The conveyors, transfer stations and train loading system will be designed to load various types of products from several stockyards and will vary from export to domestic products. The new configuration of the LOS will consist of:

Full production ramp-up at the site is expected to be achieved approximately six months after handover, toward the second half of 2019.

The Grootegeluk mining complex currently possesses two rail load-out stations, namely the Semisoft Coking Coal Load-out Station (SSCC LOS) and the D8 Load-out Station (D8 LOS). With inadequate surge bin capacity on the D8 LOS (first put into production in the 1990s), and with limitations on the loading capabilities of the SSCC LOS, the implementation of a new rapid load-out station to optimise logistical processes is imperative.

These more efficient operations will ensure compliance with the current and future requirements of Transnet, as well as ensuring Exxaro’s continued competitive advantage. It will increase the volume of transported products on rail and have faster, more accurate train loads. The conveyors, transfer stations and train loading system will be designed to load various types of products from several stockyards and will vary from export to domestic products. The new configuration of the LOS will consist of: